{"file_id":"F1","vid":"V25","name":"no_prob","var_intrvl":"discrete","var_dcml":"0","var_wgt":null,"var_is_wgt":null,"loc_start_pos":"244","loc_end_pos":"244","loc_width":"1","loc_rec_seg_no":"1","labl":"No Problem","var_imputation":null,"var_security":null,"var_resp_unit":null,"var_analysis_unit":null,"var_qstn_preqtxt":null,"var_qstn_qstnlit":"Main Problems of Manufactuing Establishment (Rank 1,2,3,\u2026 according as the priority)","var_qstn_postqtxt":null,"var_qstn_ivuinstr":"If no problem was encountered by the establishment, then check the answer of production capacity question number 15. If the answer of the question 15 is less than '5' (80 percent or above), then ask again about the problems or probe the answer of production capacity.","var_universe":null,"var_universe_clusion":null,"var_sumstat":[{"value":"0","type":"vald","wgtd":null},{"value":"0","type":"invd","wgtd":null}],"var_txt":null,"var_catgry":[{"value":"1","labl":"No problem","is_missing":null,"stats":[]}],"var_codinstr":null,"var_concept":[],"var_format":{"type":"numeric","schema":"other","category":null,"name":null},"var_notes":null,"var_val_range":{"min":"1","max":"1"},"fid":"F1","sid":"56","survey_idno":"NPL-CBS-CME-2006-v2"}