{"file_id":"F6","vid":"V82","name":"Q95_OCON","var_intrvl":"contin","var_dcml":"2","var_wgt":null,"var_is_wgt":null,"loc_start_pos":"57","loc_end_pos":"63","loc_width":"7","loc_rec_seg_no":"1","labl":"Other Construction","var_imputation":null,"var_security":null,"var_resp_unit":"selected institution","var_analysis_unit":null,"var_qstn_preqtxt":null,"var_qstn_qstnlit":"Other Construction Expenses by Description Serial Number","var_qstn_postqtxt":null,"var_qstn_ivuinstr":"The value of fixed assets at the beginning of the period and at the end of the reference period must be written in current price of the corresponding day.\n\nThe value of the addition of new or used fixed assets should be written in market price.","var_universe":"All registered institutions working in NPISH sector","var_universe_clusion":"I","var_sumstat":[{"value":"0","type":"vald","wgtd":null},{"value":"0","type":"invd","wgtd":null}],"var_txt":"Other construction includes access roads, parking facilities, fences, pipelines, communication lines, sewerage and water system, etc.","var_catgry":[],"var_codinstr":null,"var_concept":[{"title":"system of national account -1993","vocab":"SNA-1993","uri":null}],"var_format":{"type":"numeric","schema":"other","category":null,"name":null},"var_notes":null,"var_val_range":{"min":"0","max":"9999.99"},"fid":"F6","sid":"11","survey_idno":"NPL-CBS-NPISHS-2009-v0"}