{"file_id":"F6","vid":"V81","name":"Q93_LAND","var_intrvl":"contin","var_dcml":"2","var_wgt":null,"var_is_wgt":null,"loc_start_pos":"41","loc_end_pos":"48","loc_width":"8","loc_rec_seg_no":"1","labl":"Land","var_imputation":null,"var_security":null,"var_resp_unit":"selected institution","var_analysis_unit":null,"var_qstn_preqtxt":null,"var_qstn_qstnlit":"Land Expenses by Desccription Serial Number","var_qstn_postqtxt":null,"var_qstn_ivuinstr":"The value of fixed assets at the beginning of the period and at the end of the reference period must be written in current price of the corresponding day.\n\nThe value of the addition of new or used fixed assets should be written in market price.","var_universe":"All registered institutions working in NPISH sector","var_universe_clusion":"I","var_sumstat":[{"value":"0","type":"vald","wgtd":null},{"value":"0","type":"invd","wgtd":null}],"var_txt":"Land means covered and open area at institution location. Cost of land purchased plus premium paid for leased land and additions, alterations and improvements made there on are shown separately.","var_catgry":[],"var_codinstr":null,"var_concept":[{"title":"system of national account -1993","vocab":"SNA-1993","uri":null}],"var_format":{"type":"numeric","schema":"other","category":null,"name":null},"var_notes":null,"var_val_range":{"min":"0","max":"99999.99"},"fid":"F6","sid":"11","survey_idno":"NPL-CBS-NPISHS-2009-v0"}